Paks nuclear plant crucial to Hungary’s long-term electricity security
Change language:
Hungary must think long-term about the security of its electricity supply, Attila Steiner, the state secretary for energy policy, told lawmakers on Thursday, introducing a bill on extending the lifespan of the existing blocks of the Paks nuclear power plant.
According to the bill’s justification, the extended operating permits of the plant’s four blocks are set to expire between 2032 and 2037. From a technical point of view, it is possible that their lifespans can be extended by another 20 years, it adds.
The severe price increases caused by the war in Ukraine and Brussels’s flawed sanctions policy, along with energy shortages in Europe, have made the role of power plants like the nuclear plant in Paks even more important, Steiner said.
The Paks plant has for decades provided a safe, reliable and cost-efficient way to produce electricity domestically, he said.
The extension of the blocks’ lifespans will follow a long preparatory procedure which also includes talks with the governments of neighbouring countries, gathering information from international partners and signing a cooperation agreement with the International Atomic Energy Agency (IAEA), he added.






And we will be dependent on Rosatom / the Kremlin for the commensurate period of time.
Interesting read – Ukraine (obviously), Finland and the Czech Republic are turning to Westinghouse and Framatome for nuclear fuel (instead of Rosatom). Only Bulgaria, Slovakia and Hungary rely solely on Russia for all their fuel for nuclear power production – with Bulgaria (in 2021!) signing an agreement with Westinghouse to move away from (dependence on) Moscow.
https://www.rferl.org/a/rosatom-russia-nuclear-giant-escapes-sanctions/31899192.html