Construction of the Danube Bridge continues intensely – Photos

Change language:

Construction work on the brand-new Danube Bridge started in 2017 in Komárom (Komárom-Esztergom county). The structure of the bridge has already reached the Slovakian border which means that the longest and most difficult part of the bridge is ready.

The main reason for building the Danube Bridge is that it would make traffic easier, especially for trucks, because no other truck road between Hungary and Slovakia is provided near the bridge’s location – reports Portfolio. Moreover, the road to the bridge would not go through the town of Komárom, decreasing the already shocking amount of noise and air pollution. The longest part of the bridge on the  Slovakian side is completed, and the parts of the structure got in their final position.

[button link=”https://dailynewshungary.com/air-pollution-cause-of-premature-mortality-for-thousands-of-hungarians/” type=”big” color=”red” newwindow=”yes”] Air pollution the cause of premature mortality for thousands of Hungarians [/button]

Continue reading

Leave a Reply

Your email address will not be published. Required fields are marked *